Siemens to supply compressor trains for Trans Adriatic Pipeline

Siemens has won an order from the Trans Adriatic Pipeline consortium for six 15-megawatt SGT-400-driven turbo compressor trains. The Trans Adriatic Pipeline (TAP) will open up the so-called Southern Gas Corridor for Europe. Installation is scheduled for 2017 and the pipeline is expected to begin operating in late 2019.
The pipelines in the Southern Gas Corridor will transport natural gas from the Shah Deniz II field in Azerbaijan in the Caspian Sea to Europe. …. 

Onderwerpen:

Auteur: Redactie

Reageren op dit artikel is niet mogelijk.