Onderwerp: Entso-e

Energie Unie weer stapje dichterbij

9 oktober 2015 – Op 3 november zal de Europese Commissie de plannen voor een Europese infrastructuur voor stroom presenteren: het Electric Highway Project 2050. Tijdens een conferentie in Brussel (3 en 4 november) zal de...Lees verder
|Reageer|door: Redactie

ENTSO-E responds to EC consultations on Market Design

Market design to provide the power system with increasingly needed flexibility Strengthen price signals to determine electricity usage, dispatch and investment Strong regional coordination on risk preparedness, system adequacy and system operations ENTSO-E’s responses to the Commission’s market...Lees verder
|Reageer|door: Redactie

CACM implementation

ENTSO-E consults on capacity calculation regions until 24 September and holds a public workshop on 14 September The major electricity companies (the ‘majors’) in Europe have not recovered from a significant decline in their combined market...Lees verder
|Reageer|door: Redactie

Europa heeft een code voor stroomnetwerken

28 juli 2015 – Er is eindelijk een EU guideline on Capacity Allocation and Congestion Management (CACM). Naar verwachting levert het voor de EU-consumenten een besparing op van € 4 mrd. Uit het persbericht vanENTSO-E (European Network...Lees verder
|Reageer|door: Redactie