Tell us your view: stakeholders’ survey on the priority issues for the Connection Network Codes implementation guidance

In line with the forthcoming EU regulations implementing the network codes on requirements for grid connection of generators (NC RfG), demand connection (NC DCC) and requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (NC HVDC), ENTSO-E is preparing a non-binding written guidance to its members and other system operators on the elements of these regulations that require national decisions. In this context ENTSO-E seeks information from the relevant stakeholders about their priority issues by means of a survey. The survey is accessible until 22 January 2016. ….