First turbines for expansion of Bolivian power plants start their journey

12 mei 2017
Siemens

  • Two industrial gas turbines travel almost 16,000 kilometers from Sweden to the power plant Termoeléctrica del Sur in Bolivia
  • Logistical challenge to carry up to 400 special transports with heavy load over the Andes Mountains …. [Persbericht]
Onderwerpen:

Auteur: Redactie

Reageren op dit artikel is niet mogelijk.