Fugro’s cable lay spread reduces vessel downtime at offshore wind farm developments

An innovative development by Fugro for its work class remotely operated vehicles (ROVs) has been utilised successfully in cable lay touchdown monitoring operations at the Rampion Offshore Wind Farm. A new track base unit, fitted to its FCV ROV, has been introduced to ensure highly accurate cable positioning during cable lay operations in strong currents. The unit ensures the continuation of operations in strong currents by enabling the ROV to run along the seabed instead of flying through the water. It is fitted to the existing ROV frame but can be detached easily if required. …. 

Onderwerpen:

Auteur: Redactie

Reageren op dit artikel is niet mogelijk.